The installation of the FAST-PLANT® underground anchor systems is extremely fast and easy!
WATCH OUR ANIMATION VIDEO  
SUMMERIZE THE FEW, EASY AND FAST INFORMATION AND ACTIONS FOR THE INSTALLATION:
In the back side of the anchor there is a hole in which it is inserted the instrument “hammer pole”, necessary to go deep of the anchor into the ground.

In the back side of the anchor there is a hole in which it is inserted the instrument “hammer pole”, necessary to go deep of the anchor into the ground.
Hooked the anchor on the hammer pole, the anchor is placed on the ground
With the appropiate utensile (stick, hydraulic-hammer, mechanical arm, machine moviment land) it is insert until the desire dept.
Once insert the anchor, the hammer pole is slipped off through the “extraction level “, that makes the extraction easier
After being insert in the ground, the anchor, is placed in the work position, acting on the tierod,
through the utensil” traction hook”.
The anchor is in a horizontal position (Fig.1), so that its wings oppose the tie-rod force. When the traction starts , the anchor turns of 90° in a orthogonal position ( Fig. 2) towards the direction of the pull, giving the best resistance to the extraction.
After the installation, only the loop overboard the rope is out of ground to which the tie-rods are connected.
In the land with few particles the inferior angle og internal friction creates a leattle sloping cone (fig. 1), that becomes a cylinder (if is angle is 0), and the volume of land reduces. The inferior volume of land causes an inferior resistance to the anchoring.

To the contrary in lands with many particles like sands and gravel, if the angleis high, the cone is sloping (fig. 2) and the volume of land grows, so that the anchoring has a superior resistance to the traction. So these kinds of lands have good values of resistance for the extraction even for anchors in a low-rise depth. To the contrary, if the lands are sandy, it’s necessary to grow the depth of anchoring to obtain good values of resistance.

FAST ITALIA SRLS. Via Valdorme n. 263  -  50053 Empoli (FI) – ITALY | P.I/C.F  06751340487
puccini.renzo@gmail.com  |  info@fastitaliasrl.it  |  amministrazione@fastitaliasrl.it
Ufficio + 39 347 6682167  |  Tel +39 348 7706460  |  Fax +39 0571 1826555
Torna ai contenuti | Torna al menu